PIP STE02465

Click here to purchase
PIP STE02465 complements PIP STS02465 and provides assistance to the engineer in the preparation of contract documents for furnishing and installing ACIP piles.

This Practice is modeled on DFI TM-ACIP-1 (Augered Cast-in-Place Piles Manual). For additional information, refer to that manual and also to DFI TM-ACIP-2 (Augered Cast-in-Place Piles Inspector’s Guide).

This Practice does not provide guidelines for lateral displacement or drilled displacement piles, also known as augered cast-in-place displacement (ACIP-D) piles. DFI manuals, the Federal Highway Administration documents and a geotechnical engineer with experience designing ACIP-D piles should be consulted for guidance on ACIP-D piles.

Product Details

Published:
02/01/2012
Number of Pages:
32
File Size:
1 file , 280 KB
PIP STE02465

Click here to purchase
This Practice provides recommendations for the design and installation of augered cast-in-place piles for use by the engineers and specifiers of augered cast-in-place piles.

This Practice supplements PIP STS02465, Augered Cast-in-Place Pile Installation Specification, and provides assistance to the engineer in the preparation of contract documents for furnishing and installing augered cast-in-place piles.

This Practice does not describe requirements for lateral displacement or drilled displacement piles, also known as augered cast-in-place displacement (ACIP-D) piles.

Product Details

Published:
03/05/2005
Number of Pages:
16
File Size:
1 file , 43 KB
PIP STE02465

Click here to purchase
This Practice complements PIP STS02465 and assists the engineer in preparation of contract documents for furnishing and installing augered cast-in-place (ACIP) piles. This Practice is modeled on DFI TM-ACIP-4 (Augered Cast-in-Place Piles Manual). For additional information, refer to that manual, FHWA-HIF-07-03 (Geotechnical Engineering Circular No. 8), DFI TM-ACIP-2 (Augered Cast-in-Place Piles Inspector’s Guide), and DFI TM-ACIP-3 (Guideline for Interpretation of Nondestructive Integrity Testing of Augered Cast-in-Place and Drilled Displacement Piles).

Product Details

Published:
03/01/2019
Number of Pages:
29
File Size:
1 file , 230 KB