PIP PNE00003

Click here to purchase
This Practice describes the requirements for the design, material selection, fabrication, installation, inspection, and testing of jacketed piping systems. This practice is not a substitute for competent engineering analysis and design based on specific requirements of each project.

Engineering should work with an experienced jacketed piping vendor to validate proposed system design and fabrication details.

Product Details

Published:
01/01/2019
Number of Pages:
23
File Size:
1 file , 230 KB
PIP PNE00003

Click here to purchase
This Practice provides guidance for the design and layout of process units and offsites. This guide should be used as a starting point for the development of plans, electronic models, and working drawings for process units and offsites. This Practice should be coordinated with the overall site and offsites layout for geotechnical, grading, zoning, building codes, life safety code, fire codes, other regulatory requirements, and owner?s and insurer?s risk assessment requirements.

This Practice describes the guidelines for the layout of plot areas, equipment, pipe racks, piping, platforms, roadways, and other miscellaneous items.

Layout includes equipment location, access and egress for personnel safety, access for operations and maintenance, and provisions for operational housekeeping and constructability.

Product Details

Published:
06/01/2013
Number of Pages:
23
File Size:
1 file , 300 KB